EVRC’s Contractors are checking the ice thickness regularly. The minimum thickness required to support the weight of flooding equipment has not yet been reached, however, we are about 80% of the way there. The safety of both our contractors and residents is important to Elbow Valley!
We will continue to monitor the ice thickness and will change this notice as conditions permit.
We are trying our best to have the rinks cleared for skating by Christmas — we require a little assistance from Mother Nature!